Contents concrete floor slab construction process1.
Formwork for interior concrete floor.
Assemble and erect formwork for slab2.
Concrete floor slab construction process includes erection of formwork placement of reinforcement pouring compacting and finishing concrete and lastly removal of formwork and curing of concrete slab.
Floors are classified based on the intended use of the floor see the table below that was adapted from aci 302 1 r 04 concrete floor and slab construction.
The terms formwork and falsework are often used in combination.
Concrete in its green form can be molded into any shape size and finish with the help of different finishing techniques and equipment to give a beautiful and long lasting surface with a high aesthetic value.
The cost of formwork is considered as 20 to 25 of the cost of the structure in building work it may be higher than this in bridges in order to reduce the cost of form it is necessary to design economical types of formwork and to mechanize its construction.
Whenever concrete decks of any floor plan have to be formed fast and economical dokaflex s is the.
The concrete is a versatile construction material used all over the world for all types of construction applications.
Formwork for decks and floors systemized approaches offer advantages.
The major innovations have focused on on site efficiency of production health and safety and environmental issues driving the concrete construction industry towards ever increasing efficiency.
We should have to remove the form work when concrete has reached a suitable strength.
The other problem of course is that until it gets hard it won t stay.
Many of these requirements are defined by the class of floor the owner wants note that decorative concrete is typically a class 1 floor.
Formwork is the total system of support for freshly placed concrete and includes the sheathing that is in contact with the concrete as well.
Jan 17 2018 explore ron bostelman s board finished concrete floors on pinterest.
Prepare and place reinforcement for slab3.
Dokaflex s the flexible hand set system for floor slabs.
The fundamental problem in constructing a suspended concrete floor is as efco technical specialist bob mccracken says that concrete is very heavy.
Formwork components can be assembled in a wide variety of systems for casting many structural shapes.
After setting and curing of the poured concrete the formwork can be lowered vertically down and then moved horizontally to other locations to cast other bays.
Formwork systems used for concrete frame construction have continued to develop significantly since the early 1990s.
Pour compact and finishing concrete floor slab4.